Skip to main content

Building Comforts

Building Comforts is a trusted provider of waterproofing, heat proofing, and construction chemical solutions in Pakistan.

Contact Info

  • Office No. 4, Plot 40-C, 12th St, D.H.A Phase 6, Nishat Commercial Area, Lane Ph-6, Defence, Karachi, 75500
  • info@buildingcomforts.com
Product

MAPEI Mapefloor FC 200 ME

A two-component epoxy floor coating that creates seamless, abrasion- and chemical-resistant finishes for industrial and commercial concrete floors.

MAPEI Mapefloor FC 200 ME
epoxy floor coating

MAPEI Mapefloor FC 200 ME

Seamless, multi-layer finish for concrete flooring.

Download TDS

Mapefloor FC 200 ME is a high-build, high-solids epoxy floor coating based on solvent-free technology. Supplied as a coloured base and hardener, it forms seamless, multi-layer coatings for the chemical protection of industrial floors and reinforced concrete slabs. It offers good abrasion and chemical resistance and can be applied as a roll-coated or structured finish, or as a non-slip system incorporating a quartz broadcast.

  • Chemical and pharmaceutical facilities
  • food industry premises
  • Car parks, warehouses, shopping centres
  • Factories, workshops and garages.
Product Details

Application & Performance

Pronil ACR 300 application

How It's Applied

Make sure the concrete is dry, clean and sound, with a compressive strength of at least 25 N/mm². Shot-blast or diamond-grind it to remove laitance and weak material, vacuum thoroughly, and repair cracks and damaged areas first. Apply Primer SN only if the concrete is porous. Premix component A, add all of component B, and mix at 300 to 400 rpm for at least 2 minutes. Never mix partial quantities, and apply within the pot life. For a roll-coated or structured finish, apply the first coat with a squeegee or roller, then finish with a back-rolled coat.

  • Mixing ratio A : B22 : 3.5 — use the complete kit
  • Mixed density1.50 g/cm³
  • Mixed viscosity10–15 Pa·s (rv5; 20 rpm)
  • Pot life35–45 minutes
  • Application temperature+5°C to +35°C
QIS ACRIMAX UV close-up application

Packaging and storage

  • Pack size25.5 kg kit: component A 22 kg + component B 3.5 kg
  • Storage conditionsOriginal packaging in a dry place at +5°C to +35°C
  • Maximum storage period>24 months

    PRODUCT INQUIRY

    Request a Quote

    Tell us about your requirements and our team will get back to you with the right product information and pricing.











    Optional. JPG, PNG, PDF or DOC files up to 10 MB.